Case Studies

Celebrating excellence through award-winning structural steel solutions

Savannah Convention Center

Case Study 4282 Tons

Located in Savannah, Georgia, is a premier event venue designed to host a variety of large-scale conventions, trade shows, exhibitions, and other events..

Bergen County Technical High School – Paramus Campus

Case Study 449 Tons

Bergen County Technical High School (BCTHS) in Paramus is part of the Bergen County Technical Schools district, offering specialized education..

Huson County Community College

Case Study 1465 Tons

Hudson County Community College (HCCC), located in Jersey City, New Jersey, has a growing and evolving infrastructure designed to support its diverse student population and academic programs..

Sanger Educational Complex - Phase 3

Case Study 1250 Tons

The Sanger Educational Complex in Fresno, California, is currently in Phase 3 of its development, involving the construction of two key facilities:..

Vanderbilt University

Case Study 1000 Tons

The Vanderbilt Basketball Practice Facility is a four-story building located in Nashville, TN, serving as a practice space and a dedicated visiting team locker room for Vanderbilt University..

MBS 2.0 Molly B's.

Case Study 55.7 Tons

The Johnson Studio at COOPER CARRY was chosen to design this new signature restaurant at Mercedes-Benz Stadium in down town Atlanta. Named after the mother of Arthur Blank..

The Detroit Events Center

Case Study 110 Tons

Little Caesars Arena (Formerly Detroit Events Center) The Little Caesars Arena, located in Detroit, Michigan, is a cutting-edge multi-purpose venue home to the Detroit Red Wings (NHL) ..

IPP Renewed Power Agency

Case Study 6700 Tons

IPP renewed intermountain power plant is a large coal-fired power plant at Delta, Utah, US. It has an installed capacity of 1,900 MW, is owned by the Intermountain Power Agency..

Plant Scherer - SCR

Case Study 40,000 Tons

The Robert W. Scherer Power Plant (also known as Plant Scherer) is a coal-fired power plant located just north of Macon, Juliett Georgia in United States. The plant has four generating units..

Selective Catalyst Reduction System Unit - 2, 3, 7 & 8

Case Study 1500 Tons

This project involves in installation of new SCR structure units UNIT-2, 3, 7 & 8 to the existing units making total 9 active units. All the members are the part of the seismic force resisting systems and..

Kaiser Roseville

Case Study 1875 Tons

Kaiser Roseville is a 6-story, 272,000-square-foot area, Hospital Building (In-Patient Bed Tower Expansion) located in Roseville, California..

Speciality Orthopedics Hospital

Case Study 396 Tons

The Speciality orthopedics hospital project is a multifaceted construction project that includes four unique areas called A, B, C, and D. These areas are interconnected and enhanced by various..

UT Health East Texas Ortho Clinic

Case Study 470 Tons

UT Health East Texas is a for-profit hospital system based in Tyler, Texas. UT Health East Texas is uniquely positioned to provide patients with access to cutting edge research and clinical therapies ..

Kobayashi Healthcare International, Inc.

Case Study 450 Tons

Kobayashi Healthcare International, Inc. consists of an existing facility being used for the manufacture of activated-carbon / iron oxide type hand warmers. The project is to expand the two..

The Equinix Secaucus Campus

Case Study 5124 Tons

Equinix is the largest global data center and colocation provider in the New York metro area, serving enterprise networks and cloud computing needs. Its network of data..

Essex County Family Courts

Case Study 2019 Tons

This new 266,000 square feet, high-rise downtown Newark facility will combine juvenile and family courts in a new home designed to welcome children and families while..

Novelis Aluminium Plant

Case Study 7724 Tons

The project involved a manufacturing unit of an aluminum plant, consisting of Cold Mill, Casting, Rolling, and Finish units, with a total tonnage of 7,724 tons. Initially, the project seemed straightforward..